Workstation Crane with Magnet Tooling for Steel Decks
No More Hand-Lifted Decks.
Still Lifting by Hand?
What We Installed
- A free-standing Gorbel workstation crane
- Custom end-of-arm tooling built around an industrial magnet
- Mechanical installation of the complete system by our crew
How the Project Came Together
From Challenge to Solution
See how each project came together, from the initial need and installation process to the finished result.
The Problem
The plant makes steel decks from 48 to 60 inches long, weighing 150 lbs each. Operators were lifting them by hand, and the company would not accept the injury risk.
How It Went In
We designed the crane and the magnet tooling as one system, sized for decks from 48 to 60 inches long, and our crew handled the mechanical installation.
The Result
Employees no longer lift the steel decks by hand, removing the injury risk that manual handling carried.