Modular Clean Rooms in Atlanta, GA
Cleanroom Space Inside Your Plant.
Plan Your Clean Room
What a Modular Clean Room Buys You
Quick answer
A controlled environment built inside an existing building from prefabricated wall, ceiling and filtration components rather than conventional construction. Cleanliness is held by filtered air volume and pressure, not by the walls, which is why the mechanical design matters more than the shell.
- Cleanliness classes from ISO 5 (Class 100) through ISO 8 (Class 100,000).
- Footprints from 8 × 8 ft enclosures to rooms with 40 ft clear spans.
- Typical uses: medical device assembly, compounding pharmacy, electronics, aerospace, laboratories.
- Classified and tested per ISO 14644-1 particle concentration limits.
Your Air Volume Holds the Class, Not Your Walls
How it works
A room within a room: a freestanding envelope of sealed panels and filtered air handling inside your existing building. Air is forced through HEPA or ULPA filters at a rate matched to the target class, then returned on a controlled path that sweeps contaminants out continuously.
One Contract, Slab to Lights
Turnkey scope
The seam between trades is where cleanroom projects usually go wrong. There is no seam here.
Rough Out Your Room Before You Call
Size a room
Set the footprint, the class and the process. The tool returns air change rate, filter count and the gowning arrangement each one implies.
Controlled Environments We Have Built
Recent work
Most of these went up inside buildings that stayed in production. Controlled production spaces, QC and inspection rooms, and packaging environments built next to the line they serve. Panels arrive finished, assembly is dry work, and the surrounding floor keeps running.
What You Will Ask Before You Call
FAQ
If your question isn't here, call the shop.
Can you build it without shutting the plant down?
Usually yes. Panel construction is dry work, and the disruptive elements are the mechanical tie-ins and any floor work. We sequence those into your downtime rather than asking for a shutdown.
What does a modular clean room cost?
Class drives it more than footprint does. The jump from ISO 8 to ISO 7 multiplies air changes, filters and mechanical capacity. We price after a site review with the full scope written out.
Do you handle the permit and inspection?
Our cleanroom installations include the permit and the inspection, and they put the structure, the enclosure, the mechanical and the electrical on one contract instead of four, including sprinkler modification below the new ceiling.
Have you worked with our kind of plant?
Manufacturing, food and beverage, and general industrial controlled environments across Georgia and the Southeast.
Who certifies it?
Certification is performed by an independent testing agency against your particle count and pressure requirements. We build to the protocol and coordinate the test rather than certifying our own work.
Can you handle a project our size?
Our largest single controlled environment to date is 30,000 square feet. Smaller enclosures around one process line are routine.
Tell Us the Class, the Process and the Headcount
Start a cleanroom project
Send us your target cleanliness class, approximate room size, and what the room will be used for. We'll schedule a site review and return a defined, itemized proposal.