Workstation Crane System for a Motor Vehicle Assembly Line

Installed in Under Five Days.

Motor vehicle manufacturer · Gorbel workstation crane system · Shipped in under two working weeks · Installed in under five days

Lifting at Every Station?

Spacious industrial warehouse with metal shelving, blue support beams, and a yellow forklift inside.

What We Installed

A Gorbel workstation crane system designed to follow the path of the assembly line conveyor from start to finish, so a crane serves every stage where parts go on.

How the Project Came Together

From Challenge to Solution

See how each project came together, from the initial need and installation process to the finished result.

The Problem

Assembly line workers were doing repetitive, heavy lifts at each stage of vehicle production, as parts were added along the line.

How It Went In

We met on site, then built approval drawings merged into the customer's own facility layout so they could see how the cranes would sit alongside their existing machinery and conveyors before anything was built. Once approved, the cranes shipped in under two working weeks and were installed by our crew in less than five days.

The Result

Assembly line employees have crane assistance for the repetitive, heavy lifting at each stage of production.

Systems Used on This Project

Lifting at Every Station on a Line?

Send us the line layout and what gets lifted at each station. We will draw the cranes into your plant drawing.